info@mcconnellelectric.ca
Just finished the early electrical prep on this two-storey addition. The Fox Blocks foundation is up and we’ve sleeved it for the new service. Between the constant rain and the excavated dirt, the whole site turned into a mud pit, but we've got the basement ready for the next stage of wiring.
Once the walls go up we’ll be running everything for the new kitchen, master suite with bath, and the rest of the addition. Looking forward to the future porch with pot lights and more in the soffits—plus that kitchen is going to look sharp when it’s finished. Everything’s staged and ready to move forward.
